Panama City, Florida

The Port of Panama City has a skilled workforce handling 350 vessel calls per year with nearly 1.4 million tons of breakbulk and bulk cargo and 50,000 TEU’s. CFS services are also available to container customers and a licensed metal exchange house.

Specifications and services

Location: Centrally located on the north side of St. Andrews Bay 8 miles up the ship channel from the Gulf of Mexico (30°10’35.39″ N, 85°43’47.50″ W)

Size: 125 acres / 50.6 hectares, additional 560 acres / 226.6 hectares available

Water Depth: 32 feet / 9.8 meters

Berths & Length: 6 berths, measuring 3,840 feet / 1,170 meters, which includes a barge berth measuring 600 feet / 183 meters

Cranes: 5 – (1) 300-ton heavy lift, (1) 150-ton Gantry, (1) 85-ton Gottwald, (1) 200-ton Linkbelt & (1) 75ST gantry

Truck Lanes & Scales: Scales on site

Rail Services: Line connects to CSX

Highway Access: U.S. 231 connects with I-10, 50 miles north of the port

Cargos / Commodities Handled:

  • Containers
  • Steel
  • Forest Products
  • Bulk & Heavy Lifts

Other facility facts

West Terminal

CFS: Services are available

Warehouse & Storage: 265,000 square feet / 24,619 square meters of warehouse, and 20 acres / 8 hectares of paved storage

Heavy Lift Service: 300-ton 1400 American with direct rail capabilities

Foreign Trade Zone: FTZ #65

East Terminal

Port of Panama City acquired 40-acre terminal from West Rock Paper Company in 2018.  Terminal is being renovated and phase 1 will open 2nd Quarter of 2019, phase 2 scheduled for 2023.

Phase 1: Berths 1, measuring 700 ft.

Cover space:  260,000 square feet

Laydown Area:  Approximately 5 acres