Lynnterm Terminal Operations
North Vancouver, British Columbia, CanadaSpecifications and services
Location: Port of Vancouver, British Columbia (49°18’5.60″ N, 123°2’16.95″ W)
Size: 95 acres / 59 hectares with heavy-duty paved area for outside cargo storage
Water Depth: 39-49 feet / 12-15 meters
Berths & Length: 4 berths, measuring 4,974 feet / 1,516 meters, all concrete
Cranes: Available upon request
Reefer Services: Available
Rail Services: Direct service by the CN Railway and interchange with all major railways. Approximately 7.5 km (4.7 miles) of track providing direct access to warehouse and storage area. A track along the dockface backed by an extensive holding area provides direct transfer to/from-railcar capabilities. Railcar shunting equipment is available for switching on the site.
Highway Access: Trans Canada Highway #1 is minutes away, providing fast turnaround time to the trucking industry
Cargos / Commodities Handled:
- Breakbulk
- Containers
- Bulk
Other facility facts
Lynnterm Receiving/Delivery Hours:
Gate Hours: 0800 – 1600 (0700 Start Optional)
Steel and General Cargo Deliveries: 0800 – 1530 (0700 Start Optional)
CFS: Dock is equipped to accommodate the handling and stuffing/de-stuffing of containers.
Warehouse & Storage: 8 warehouses comprising 876,000 square feet / 81,750 square meters suitable for storage of forest products, general cargo and steel. The warehouses are serviced by rail trackage and have covered unloading aprons for trucks and railcars.
Maintenance: On-site maintenance for servicing and repair of all terminal equipment with on-site gear locker for the quick response of vessel and stevedoring gear requirements
Other Equipment: Over 200 pieces of specialized equipment with capacities ranging from 2,500 kg. (5,500 lb.) to 42,000 kg. (92,400 lb.) to meet all cargo handling requirements
Internet Access: Yes, password protected